The CDM 2007 Regulations stipulate that anybody involved in the provision of a fire protection package, at any level, share legal liability for its decisions or operations in the event of fire losses. The responsibility involve:

  • The selection of the fire protection system.
  • The appointment of the installer.
  • The time provided for the installation.
  • The liaison between the different parties to ensure correct installation.
  • The eventual ignorance of knowing advice that leads to a failure in the fire performance of any passive fire protection system installed or commonly to a failure of any unprotected element within a building.

The ductwork systems are designed to distribute air around a building, and the fire protection to any such systems is of particular concern.

Under Construction

Our latest blog posts

  • 1
  • 2
  • 3

SIV Fire Protection has delivered anothe…

SIV Fire Protection has delivered another project on time with completion of passive fire protection work at the County Mall Shopping Centre in Crawley

Specialist London passive fire protection contractor SIV FP have completed the installations of a range of fire protection sytems to the refurbishment of the Shopping Mall in Crawley.

Read more

The Arsenal FC Youth Academy to be prote…

The Arsenal FC Youth Academy to be protected by SIV Fire Protection.

London's leading passive fire protection contractor SIV FP has been appointed to carry out the passive fire protection works at Arsenal F.C. Academy, Hale End Sports Ground.

Read more

Specialist London passive fire protectio…

SIV were given green light for commencing fire protection works at Spitfire Business Park in Croydon.

Read more

SIV ACCOLADES


Scroll To Top